
IT Disaster
Recovery
|
Prior to selecting a Disaster Recovery strategy, the Disaster Recovery planner should refer to their organization's business continuity plan which should indicate the key metrics of Recovery Point Objective (RPO) and Recovery Time Objective (RTO) for various business processes (such as the process to run payroll, generate an order, etc). The metrics specified for the business processes must then be mapped to the underlying IT systems and infrastructure that support those processes. Once the RTO and RPO metrics have been mapped to IT infrastructure, the DR planner can determine the most suitable recovery strategy for each system. An important note here however is that the business ultimately sets the IT budget and therefore the RTO and RPO metrics need to fit with the available budget. While most business unit heads would like zero data loss and zero time loss, the cost associated with that level of protection may make the desired high availability solutions impractical.
In many cases, an organization may elect to use an outsourced disaster recovery provider to provide a stand-by site and systems rather than using their own remote facilities. In addition to preparing for the need to recover systems, organizations must also implement precautionary measures with an objective of preventing a disaster situation in the first place. These may include some of the following:
|
BackupSolutions
Tape Backup ConnectivitySolutions
ADSL
|